Sign In | Join Free | My chinacsw.com |
|
Categories | Egg Processing Machine |
---|---|
Condition: | New |
Applicable Industries: | Hotels, Food & Beverage Factory, Restaurant |
Weight (KG): | 110 |
Showroom Location: | None |
Video outgoing-inspection: | Provided |
Machinery Test Report: | Provided |
Marketing Type: | New Product 2021 |
Warranty of core components: | 1 Year |
Core Components: | Motor |
Place of Origin: | Guangdong, China |
Brand Name: | Huafood |
Type: | Food Processing Machinery |
Warranty: | 1 Year |
Application fields: | Vegetable processing plant, Cannery, Winery, Meat processing plants, Commercial catering, Snack food factory, Dairy products factory, Beverage Factory, Seasoning plant, Fruit processing plant |
Machinery Capacity: | 3000-5000pcs/h |
Machinery Function: | Egg breaker separate egg whites from yolks |
Electric heating and motor power: | 10KW/0.75KW |
Diameter depth: | 600*420mm |
Heat transfer oil quantity: | 25kg |
weight: | 110kg |
voltage: | 380v |
Volume: | 50L |
Application: | Food Industry |
Material: | 304 Stainless Steel |
Heating method: | Electric /motor/steam Heating |
Feature: | Thickened Insulation Layer |
Packaging Details: | International standard wooden case packing |
Port: | shanghai/qingdao/tianjin/shenzhen |
Supply Ability: | 100 Set/Sets per Month |
Price: | $2,500.00/sets 1-9 sets |
Company Info. |
Henan Huafood Machinery Technology Co.,Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Volume(L) | Electric heating and motor power (KW) | Diameter depth (MM) | Heat transfer oil quantity(KG) | weight(kg) | voltage(V) | |||||
50 | 10KW /0.75KW | 600*420 | 25 | 110 | 380V | |||||
100 | 12KW /0.75KW | 700*470 | 32.5 | 125 | 380V | |||||
200 | 16KW /1.5KW | 800*550 | 42.5 | 150 | 380V | |||||
300 | 18KW /1.5KW | 900*600 | 60 | 200 | 380V | |||||
400 | 24KW /1.5KW | 1000*680 | 75 | 250 | 380V | |||||
500 | 27KW /2.2KW | 1100*720 | 100 | 300 | 380V | |||||
600 | 30KW /2.2KW | 1200*780 | 125 | 350 | 380V | |||||
We also produce steam heating jacketed pots |
Delivery Way | Delivery Time |
By air | About10-20 days days after leaving the port |
By sea | About20-30 days days after leaving the port |