Sign In | Join Free | My chinacsw.com |
|
Categories | Ejector Pins And Sleeves |
---|---|
Brand Name: | DATONG |
Model Number: | DT-004 |
Certification: | ISO 9001:2015 |
Place of Origin: | Dongguan P. R. China |
MOQ: | MOQ: 10 pcs |
Price: | 0.2-2 usd/pc |
Payment Terms: | T/T, Western Union, L/C |
Supply Ability: | 50000-60000 pcs per month |
Delivery Time: | 5-8 days |
Packaging Details: | Plastic bag (with anti-rust oil)+ forming film, PVC tube, plywood box etc according to the quantity. |
Material: | SKD61/SKH51/SKD11/ 1.2344, 65mn etc. |
Surface treatment: | Nitriding, chemichal blacking, TiN, TiCN ALCRN PVD DLC |
Hardness: | Through hardened and core hardness: HRC 40-45dness; |
Standard: | DME, HASCO,MISUMI, PUNCH, Customised |
Customised service: | Available |
Product Name: | stepped ejector pin, straight head pin |
PRODUCT DESCRIPTION
DIN1530C DIIN1530CH Plastic Injection Mold Shoulder Ejector Pin Die Mold
Standard: DME, HASCO,MISUMI, PUNCH, Customised
Material: SKD61/SKH51/SKD11/ 1.2344, 65mn etc.
Treatment: Nitriding, chemichal blacking, TiN, TiCN ALCRN PVD DLC
Product Name | DIN1530C DIIN1530CH Plastic Injection Mold Shoulder Ejector Pin Die Mold |
Standard | DIN1530CH WS 1.2210 HRC 58-62 DIN 1530C WAS 1.2344 >=HV 950 HRC 40-45 DIN 1530C-B WAS 1.2344 >=HV 950 HRC 40-45 |
Surface treatment | Tin, Ticn, Aitain, Ticrn, Nitrided, Black oxygened, etc |
Heat treatment method | High frequency quenching, vacuum heat treatment, tempering treatment,cryogenic treatment |
Lead Time | Sampling: 3-5 workdays Normal making: 5-10 workdays Complex design/making: 10-18 workdays |
Materials | WS 1.2210, WAS 1.2344 |
Package | 1.the goods is paked in polybag, then into carton and pallet. 2.Can done by customer's requirment. |
Our Main Products
Plastic injection mold components, accessories:
Ejector pin series: ejector pin, stepped pin, core pin, insert pin, flat pin, shoulder pin etc.
Ejector sleeves
Punches,
Die casting mold components
CNC machinery parts
Autocar parts
Guide bushing & wear plate
Air poppet valves
Locating parts, taper interlock
Springs
Professional team, advanced equipments.
Our equipments:
Strict quality control:
Standard but solid package for shipment:
1.plastic bags.
2.cartons
3.Plywood cases, each container is clearly labelled before dispatch.
Port :Shenzhen port , Guangzhou port and another port in Guangdong province,China.
Delivery details : Normally shipped in 3-7 days after payment. Delivered by EMS,Fedex,DHL,TNT,ARAMEX or by sea.
Q&A:
Q1. Are you a trading company or a factory?
A: We are factory in Dongguan over 13 years, but we also have a professional team for the overseas business and after sales service.
Q2.How to get a quotation?
A: for standard product: model + size and quantity.
for non standard products: provide drawing and quantity.
Q3: How long is your delivery time?
Generally the delivery time is 3-5 days, it varies according to the products and their quantity.
Q4: Do you provide samples? Is it free or payable?
Q5. How can you guarantee quality?
Advanced Machine Equipment+ Mature Technology+ Skilled Workers ensure the quality of our products. Also our QC Department will check each piece before every shipment.
Q6. After-sale Service
Contact us if you have any question after receiving the samples or products, we’ll try our best to solve the problem until you are satisfied!
Q7: Standards
All the mainstream standards in the world such as DIN, JIS, AISI, ISO, DME, MISUMI, PUNCH, FIBRO, HASCO, DAYTON, etc.
![]() |