Sign In | Join Free | My chinacsw.com
chinacsw.com
Products
Search by Category
Wholesale Marketplace
Home > Earth-moving Machinery >

Mini Shovel 2.5 Ton Wheel Loader Running hour meter Option

Categories 2.5 Ton Wheel Loader
Brand Name: MCLLROY
Model Number: MCL940 ZL940
Certification: CE,ISO9001
Place of Origin: China
MOQ: 1 Set
Price: $ 4000-6000 /Unit
Payment Terms: 30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
Supply Ability: 100 sets / month
Delivery Time: 5-8 working days
Packaging Details: Nude ,3 Sets Fasten Packing in 1 40HQ
Moving type: Wheel Loader
Type: Front Loader
Engine power: 76kw
Engine Brand: Yunnei YN4102 Supercharged
Emissions: EU Stage II
Condition: New
Rated Load: 2200kg
Bucket Capacity: 1.2m3
Dumping height: 3500mm
Alex: Large-Hub
Max. Travel Speed: 28 km/h
Machine weight: 5800KG
Dimension(long * breadth * high): 6330*2170*3080mm
After-sales service provided: Engineers available to service machinery overseas,Video technical support,Online support
Color: Customize
Attachments: Fork,Snow bucket,Kinds,trencher
Axle Base: 2560 mm
Brake: Air Brake
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Mini Shovel 2.5 Ton Wheel Loader Running hour meter Option

Mini Shovel 2.5 Ton Wheel Loader Running hour meter Option

1. Products Description

In general, for construction machinery, the four most important factors are: price, quality, operation, and after-sales.


The amount of shovel material and the stability of the loader depend on the cooperation of the loader frame.

The flexibility and light operation mainly depends on the hydraulic system of the loader.

The low failure rate depends on quality as well as the after-sales service.


MCLLROY wheel Loaders are widely used in the construction, municipal engineering, urban and rural gardens, lime, sand, cement factories, mines and other enterprises and institutions and departments. It is particularity applied to the narrow space for the loading operation of stone,sand and other construction materials.


2. Specification

MODELMCL 940
ENGINEEngine ModelYun Nei 4102 Supercharged
RPM2400
Rated Power76 kW
EmissionsEU Stage II
WEIGHTSOperating Weight6100 kg
Rated Load2800 kg
BUCKETSBucket Capacities1.2 m³
TRANSMISSIONMax. Travel Speed28 km/h
Gear BoxCVT
280 torque converter
AlexLarge hub
Axle Base2560 mm
BrakeAir Brake
HYDRAULIC SYSTEMHydraulic Cycle time - lift≤ 6 s
DIMENSIONS(APPROXIMATE)Min. Ground Clearance400 mm
Wheel Base1640 mm
Reach at Max.Dump Height3600 mm
Dump Reach≤ 650 mm
Overall Length - With Bucket6240 mm
Overall Width2040 mm
Overall Height2830 mm
OPERATING SPECIFICATIONSTyre Size1670-24
Breakout Force52 KN
JoystickMachanical
Min. turning radius≤ 6200 mm
STANDARD EQUIPMENTHour meterYes
Tool BoxYes
Dual Hight&Low Speed HandleYes
OPTIONAL EQUIPMENTAir Conditioning/heaterOption
Quick ChangeOption
Multifunctional AttachmentOption
Hydraulic PilotOption

3. Details and Advantages

The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

1) Tire:38% Rubber content tire,Wider off-road tire

2) Frame:The thickened frame has strong impact resistance and remarkable passing performance, enabling the loader to pass unimpeded in the difficult working environment.

3) Cab:Large space in the H-series cab The low-noise and shock-absorbing cab

4) The brake caliper is exposed to facilitate servicing.

5) The bucket with high wear-resistant material even is used for stone.


4.Production lines:

A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection

Assembly:

Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components.


Second step is to connect the engine and gearbox together, install drive shafts, add engine lubricant. oil, connect the pipeline of working pump and walking pump.

At this point ,don't forget to apply sealant on working pumps and walking pumps , apply oil seals, tighten screws, to ensure there will be no oil leaking; adding engine lubricant. oil is important (there are winter lubricant. oil and summer lubricant. oil, the oil suitable for winter is relatively thin, the oil used in summer is relatively thick ).

Two workers work together to finish the task.



Similar Model:

Cat 903D/906M/907M/908M

XCMG LW156/LW160/LW180/LW186/LW200

Liugong 816C

SDLG LG916 LG918 L918


Buy Mini Shovel 2.5 Ton Wheel Loader Running hour meter Option at wholesale prices
Send your message to this supplier
 
*From:
*To: Chanchiyo Holdings Group
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0