Sign In | Join Free | My chinacsw.com
chinacsw.com
Products
Search by Category
Wholesale Marketplace
Home > Power Accessories >

High Strength Cable Stayed Bridge Compact 100 / 200 Type Self Anchoring Large Span

Categories Bailey Suspension Bridge
Brand Name: Great Wall
Model Number: CB100 and CB200
Certification: BV,SGS,CCIC,CNAS,CE
Place of Origin: Zhenjiang City , China
MOQ: According to the order
Price: According to the order
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 50,000 Tons per year
Delivery Time: According to the order
Deck: Steel Deck/Timber Deck
Surface Protection: Alkyd Painted or hot dip galvanized
Advantage: fast delivery;easy to install
Quotation: The highest performance-price ratio in the same trade
Addition services: Transportation insurance;Detailed Installation Guidance;According to the order
Type: Steel Truss Bridge
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

High Strength Cable Stayed Bridge Compact 100 / 200 Type Self Anchoring Large Span

Steel Cable Suspension Cable Stay Bridges High Strength for Large span

Description

Cable-stayed Bridges are of a suspension form using straight cables which are directly connected to the deck. The structure is self-anchoring and therefore less dependent upon good foundation conditions, but the deck must be designed for the significant axial stress from the horizontal component of the cable forces. The construction process is quicker than for a suspension bridge because the cables and deck are erected at the same time and the amount of temporary works is reduced.



Suspension Bridge is a kind of suspended-cable-system bridge,in which the steel decks are used as members,can be exerted the steel characteristic of high tensile totally in a big span,mainly used to span the wide river,bay and canyon,possessing te advantages of quick erection,short construction time and the bridge components can be used repeatedly;The span length is adapted to 60-300m.

Specifications
Single laneDouble lane
Width:Standard roadway: 3.15m / 4m/4.2mStandard roadway:7.35M
Maximum Free Span:300M200M
DeckAnti-skid Steel/Timber/Concrete/Epoxy Mixture Material
Loading Capacitydesign according to different requirements,like people walking, 40TONNES,AASHTO HS20,HS25-44,BS5400HA+30HB,Truck-60,Trailler 80,etc.
Corrosion PreventionOriginal Painted Or Hot Dip Galvanized
Bridge TypeCables Suspended ; Compact-100 & 200-type
AdvantagesBig Span, bridge components used repeatedly,etc
DisadvantagesMore complicated in erection;Installation tools need to be special-made;High-cost of Cables

Bailey Bridge From China ;Great Wall Profile.pdf


Buy High Strength Cable Stayed Bridge Compact 100 / 200 Type Self Anchoring Large Span at wholesale prices
Send your message to this supplier
 
*From:
*To: Zhenjiang Great Wall Heavy Industry Technology Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0