Sign In | Join Free | My chinacsw.com
chinacsw.com
Shenyang Zhengchuang Construction Machinery Co., Ltd
Home >

Tower Crane Bases Fixing Angle Bases Fixing Angles For L46C Mast

Tower Crane Bases Fixing Angle Bases Fixing Angles For L46C Mast

Country/Region china
Company Shenyang Zhengchuang Construction Machinery Co., Ltd
Categories Digital Breath Alcohol Tester
Update 2019-08-10 05:34:03
ICP License Issued by the Chinese Ministry
Contact Now

Bases Fixing Angles For L46C Mast

Bases Fixing Angles For L46C Mast Manufacturers, Bases Fixing Angles For L46C Mast Factory, Supply Bases Fixing Angles For L46C Mast
Bases Fixing Angles For L46C Mast
  • Brand ZCJJ
  • Product origin China
  • Delivery time 5days
  • Supply capacity 20sets

Palau Tower Crane, Nauru Tower Crane,

Email
AddThis Sharing Buttons
Share to FacebookFacebookShare to TwitterTwitterShare to EmailShare to PinterestPinterestShare to LinkedInLinkedInShare to WhatsAppWhatsAppShare to ...AddThis

Products Specification

Type , Model: Bases Fixing Angles For L46C Mast

Size: 1.6M

Use forL44A1, L46A1,L46A2 ,L46A3 mast section ,P16A P16E, R16A, R16E , 1.6m L type mast

Materials: Q345B

Process: Blasting derusting,

PaintingUnder painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

Bases Fixing Angles For L46C Mast

Tower Crane Knowledge sharing:

Say the problem that the foundation of tower crane should pay attention to

2, tower crane installed in the basement garage raft, there are several ways,

: the tower crane base surface is as high as the basement raft surface. The raft reinforcement shall be reserved, and the reserved steel reinforcement shall be accurate.

: the base surface of the tower crane is as high as the bottom of the basement raft. It is particularly noted that the base surface of the tower crane is 10cm lower than the bottom of the raft. If the base surface of the tower crane is high, the raft reinforcement cannot be constructed.

Bases Fixing Angles For L46C Mast

: in case of settlement post-pouring belt of Kentucky, the foundation plane must be lowered to the bottom elevation of settlement post-pouring belt.

The foundation plane should be about 10cm lower than the bottom elevation of settlement post-pouring belt. It is convenient for post-pouring belt to pass through.

Five, install the plug

When mounting the bolt of tower crane base, the horse stool must be firm, because the bolt should be strengthened under the surface layer. There are several steps to install the plug

(1) place tripod, tripod four corners have control of the size of the round hole, generally fixed tower crane bolts have 16, the bolt must be vertical, the bottom of the bolt to be reinforced with steel brace reinforcement, and to use the line hanging straight, when strengthening the bolt tripod four corners to be horizontal, keep the tripod four corners flat.

(2), especially to emphasize that the tripod must be flat in the building, if the building is two adjacent, and not in a line, Angle into 30 degrees or 80 degrees between, tower crane positioning will pay attention to, positioning is not good to the end of the project will cause tower crane arm can not be removed.


Product Tags:

tower crane

      

mast section

      

fixed tower crane

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Tower Crane Bases Fixing Angle Bases Fixing Angles For L46C Mast Images

Inquiry Cart 0
Send your message to this supplier
 
From:
To: Shenyang Zhengchuang Construction Machinery Co., Ltd
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0