Sign In | Join Free | My chinacsw.com
chinacsw.com
Products
Search by Category
Wholesale Marketplace
Home >

Turgo Type High Head Water Turbine Generators Simple Compact Structure

Categories High Head Water Turbine
Place of Origin: Sichuan, China (Mainland)
Brand Name: Forster
Model Number: XJA-w-63/1*14
Supply Ability: 30 Set/Sets per Month
Packaging Details: wooden box
MOQ: 1 Set/Sets
Price: Negotiable
Certification: CE/TUV/ISO9001/From-E
Payment Terms: L/C, T/T
Delivery Time: 120days
Water head: 35-70m
Rated power: 21.3-62.7kw
Frequency: 50Hz/60Hz
Voltage: 400v
Rated output power: 21-62kw
Generator type: SFW630-8/990
certificate: CE/TUV/ISO9001.2008
Life time: 30-50years
Flow Rate(m3/s): 0.089-0.127m3/s
Keyword: micro hydro turbine generator
Port: shanghai port
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Turgo Type High Head Water Turbine Generators Simple Compact Structure

    China ' s Best Factory Supply Micro Hydro Turgo Turbine Generator For Micro Hydro Power Plant


    Our main products included:


    1. Kaplan turbine generators series.


    2. Turgo turbine generators series.


    3. Tubular turbine generators series.


    4. Francis turbine generators series.


    5. Pelton turbine generators series.


    Product features:


    When the slanting turbine is working, the water flows from the pressure water pipe through the nozzle to form a high-speed jet, and the jet and the runner plane impact the rotor blade in a 22.5° direction. After the work is done, the water flows out from the water outlet of the bucket and is discharged downstream along the tailwater channel.
    In order to ensure free flow of the jet, the turbine runner must be installed above the water level of the tailrace, and the runner should be no less than 0.5m from the water level of the tailrace.


    1. Water energy is converted into mechanical energy
    A hydraulic turbine is a machine that converts water energy into mechanical energy. The parameters describing the water energy are head (H meters) and flow rate (Q meters 3 / sec). The operating parameters describing the turbine are head (H meters), flow rate (Q meters 3 / sec), power (N kW), speed (n rev / min) and efficiency (η%).
    The water flow hits the vane, and the vane changes the direction of the water flow, that is, the force of the vane feed water. According to the law of action reaction, the water flow gives a reaction force to the vane. This causes the vanes to rotate around the axis, which drives the generator or other processing machinery. This is the process by which water can be converted into mechanical energy.


    2. Factors affecting turbine output power
    The rated power of a turbine is the shaft power output by the turbine at the rated head and rated flow. When the actual working head of the turbine is smaller than the rated head proposed by the turbine manufacturer, although the inlet valve is fully open, the turbine power is still less than the rated power, and the generator cannot carry the rated load. At this time, if the power consumption of the generator with the nameplate output is insufficient, the voltage is insufficient, the cycle drops, the motor cannot be started, and the electric lamp is red. The actual output of the turbine cannot reach the nameplate output. In another case, the valve opening is insufficient, or the water inlet is clogged, which affects the water intake. Similarly, the turbine cannot produce sufficient power.


    In addition to the close relationship between the head size and the flow rate, the turbine output power is also related to the efficiency of the turbine. In the process of converting the energy of the water into mechanical energy, the flow and the head are depleted, and the flow of water in the flow of the runner has impact and friction loss, so that the output mechanical energy of the turbine is less than the water energy. The ratio of the output power of the turbine shaft to the water energy (power) of the input turbine is called the efficiency of the turbine.


    1. Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.


    2. The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.


    Product features:

    XJ02-W-40/1 x 11 turbine performance data and supporting table
    ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
    Design head(m)Under the design headDesign speed (r/min)The power of generatorThe runaway speedRated speed(r/min)manuallyautomaticModeldianeter
    Flow rate (m3/s)The output(kw)
    XJ02-W-40/1 x 11350.20855.1592556001320Direct connectionmanuallyYTT-Z41 H-300
    400.22367.6632556001320#####
    450.23679.5371756001320#####
    500.24993.4707757501650#####
    550.261108.97411007501650#####
    600.273124.57751007501650#####
    650.284139.48061257501650#####
    700.295154.68371257501650#####
    750.305169.28661607501350#####
    800.315185.989416010002200#####
    850.32520692220010001800#####
    900.334225.694920010001800#####
    950.343246.597520010001800#####

    Product pictuers:



    Company Information

    Our workshop

    Advantages

    Packaging & Shipping

    FAQ

    Q1, Which turbine should I choose?

    Please tell me the water head, flow rate, frequency, Total power you need

    , voltage, on grid or off grid operation, we will propose a solution.


    Q2, Can your factory provide all the equipment for hydropower generation?

    Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.


    Q3, Can you do EPC for a hydroelectric power plant?

    Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.


    Q4,Is your company a trading company or a manufacturer?

    We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.


    Q5, What is an acceptable MOQ?

    For this product, our acceptable MOQ is 1 set.


    Q6,How long is the delivery time?

    Delivery times range from 15 days to 6 months depending on the model you are purchasing.


    Q7,Does your company have its own independent official website?

    Of course, and we can see more information about our company and products on our official website.

    website address: www.fstgenerator.com



    Product features :

    1. Horizontal unit has the advantages of a simple structure,easy maintenance,reduce plant height ,reduce the excavation depth.

    2. Vertical unit has a small plant size plane,one can install multiple nozzles(currently up to six nozzles can be installed)on the wheel,high specific speed,the same capacity unit size is relativety small and weigh lightly.


    Product parameters:



    Product pictuers:


    Other products:

    Company Information

    Our Workshop:

    Advantages:

    Packaging & Shipping

    FAQ

    Q1, Which turbine should I choose?

    Please tell me the water head, flow rate, frequency, Total power you need

    , voltage, on grid or off grid operation, we will propose a solution.

    Q2, Can your factory provide all the equipment for hydropower generation?

    Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

    Q3, Can you do EPC for a hydroelectric power plant?

    Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

    Q4,Is your company a trading company or a manufacturer?

    We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

    Q5, What is an acceptable MOQ?

    For this product, our acceptable MOQ is 1 set.

    Q6,How long is the delivery time?

    Delivery times range from 15 days to 6 months depending on the model you are purchasing.

    Q7,Does your company have its own independent official website?

    Of course, and we can see more information about our company and products on our official website.



    Buy Turgo Type High Head Water Turbine Generators Simple Compact Structure at wholesale prices
    Send your message to this supplier
     
    *From:
    *To: Chengdu Forster Technology Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0

    Friendly Links: www.everychina.com

    Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

    Copyright © 2009 - 2024 chinacsw.com. All rights reserved.