Categories | Investment Casting Parts |
---|---|
Brand Name: | twin connector part |
Model Number: | Ottommo-C-1045-14 |
Certification: | ISO9001, TS16949 |
Place of Origin: | China |
MOQ: | 1000 PCS |
Price: | according to drawing |
Supply Ability: | 10,000 PCS per month |
Delivery Time: | 20-25 working days after PO |
Packaging Details: | parts in carton, and cartons in pallet |
material: | 1045 carbon steel or according to drawing |
silicon or sand casting: | silicon casting |
machining: | according to drawing and customer requirements |
surface treatment: | according to drawing and customer requirements |
lead time: | 20-25 working days after PO |
test: | 100% use gauge |
Company Info. |
Ningbo Ottommo Casting Co., Ltd |
View Contact Details |
Product List |
twin connector part
Carbon steel twin connector precision metal casting for electric tools
Description
Investment casting is a way of casting, which is cmposed of wax mould, shell mold, pouring, after treatment and package, whose lead time will be 20-25 working days after PO.
Item | Description |
Product Name | connector part |
how to test | 100% use gauge |
Material | 1045 carbon steel |
Surface Treatment | According to the requirement of customer |
Application(Products cope) | electric tools |
Quality Control | ISO9001, TS16949 |
Thickness | Only to raw casting, more than 4mm |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Service | 24-hour reply to customer's enquiry |
Inspection | IQC, IPQC,FQC,QA |
Mould | Depend on customer's require to make the mould. |
Sample confirmation | Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied. |
Packing | Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements |
Payment & Shipping Terms:
Minimum Order Quantity: | 1000 |
Price: | Quoted per see the drawing or sample |
Delivery Time: | 20-25 working days after received PO |
Payment Terms: | T/T, L/C |
Supply Ability: | 10,000pcs per month |
FAQ:
Q: Who Are We?
1.We are a factory do the casting for more than 10 years.
2.Aroud more than 200 workers and 3000 square meter workshop
3.Customizing services, OEM services and good after services, etc.
Q: What is the lead time?
If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.
If do the mass production, the lead time will be with 20 working days after receiving the PO.
Why should you choose us?
1. We can do the part according to your drawing.
2. Rich experience and good technology support ( with senior and professional engineers with more than 7 years experience).
3. 100% inspection before delivery.
4. Competitive price with high quality.
5. Convenient transportation ( port: Ningbo, Shanghai)
6. Better operators in the office doing the export, who have done export business for more than 10 years, have good relationship with custom and shipping companies.
About Us
Customer Services
Sell On Us
Friendly Links: www.everychina.com
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们